MORE
West Newton Rutland Apartments
In Progress
This scattered site project consists of 28 buildings with 146 housing units located in the South End of Boston. These units had not been renovated since the 1990’s. Our work includes installation of fire protection lines, drainage systems, concrete walkways, and basement excavations.
125 Amory Street Apartments
Completed
Our work for this project includes site work, reset of granite curb, asphalt paving, erosion control, lights installation, and drainage.
Michael Haynes Arms Apartments
In Progress
Our work for this project includes building demolition, site preparation, earthwork, erosion and sediment control, install of concrete pavers, site water lines, sanitary sewage system, storm drainage system.
Indigo Block Infrastructure Improvements
Completed
Our work at the Indigo Block includes erosion control, dewatering, concrete demolition, excavation, water services (cap, gate, line), fire hydrant installation, asphalt paving, concrete walkways construction, and a playground equipment update with soft surfacing installation.
Woods-Mullen Shelter Addition
In Progress
Our role for the Woods Mullen Addition project is selective site demolition, earthwork, cast in place concrete, and sidewalk construction and replacement.
41 North Margin Street Senior Apartments
In Progress
Our work for this project includes site preparation, earthwork, water, sewer & drain, ballads, pervious pavers, and bituminous paving.
22 Fleet Street
In Progress
This project includes demolition, excavation, and cutting and capping both the water and sewer services. Also, installing a fire protection line, domestic water line, sanitary sewer service, and storm drain service.